Use * syntax for faster search

Table of Contents



Overview 

Cost Lines on the DSP grid can be linked to new or existing campaigns in The Trade Desk, reducing the need to manually re-enter details across multiple platforms:

Linking OptionDescription
Link to a new campaign in The Trade Desk

In OneStrata, upload a Cost Line to create a new campaign in The Trade Desk. The Cost Line is automatically linked to the newly created campaign.

Link to an existing campaign in The Trade Desk

In OneStrata, link a Cost Line to an existing campaign in The Trade Desk.

Linking a Cost Line to a campaign in The Trade Desk creates a connection that allows delivery costs and metrics to flow from The Trade Desk to OneStrata. The delivery data is available on the Actualization tab for viewing and actualization.


Link a Cost Line to a New Campaign in The Trade Desk

To create a new campaign in The Trade Desk and link a Cost Line to the newly created campaign, do the following:

  1. Open the OneStrata campaign that contains the desired Cost Line. This Cost Line must have a Supplier entity that is linked to The Trade Desk.

  2. Go to the DSP dashboard for The Trade Desk.

  3. If not logged in already, log in to The Trade Desk.

  4. In the DSP grid, select the Cost Line. Only one Cost Line can be linked at a time.

  5. Click the Upload button to open the Upload widget.

  6. In the Upload widget:
    Field NameAction

    Create Campaign / Existing Campaign

    Select the Create Campaign option.

    Advertiser

    Search for an advertiser in The Trade Desk by entering at least three letters of the advertiser name.

    Then, select the desired advertiser.

    Campaign Type

    Select the type of the campaign:

    • Solimar
    • Kokai

    Only available if Campaign Type is Kokai

    Seed ID

    For a Kokai campaign, enter the identifier of the seed to attach to the campaign.

    Name

    Choose one of the following options:

    • Keep the automatically generated campaign name. By default, the campaign name is the same as the OneStrata Cost Line name.

    • Enter the desired campaign name.

    Budget Amount

    Choose one of the following options:

    • Default to Cost Line: Use the Vendor Net Cost value of the Cost Line as the campaign budget.
    • Manual Input: Enter the campaign budget.

    Start Date

    Select a start date for the campaign.

    Optional

    End Date

    Optional: Select an end date for the campaign.

    Objective

    Select a campaign objective:

    • Awareness
    • Consideration
    • Conversion

    Primary Channel

    Select a campaign channel.

    • Display
    • Video
    • Audi
    • TV
    • Native Display
    • Native Video
    • Digital Out of Home


    Primary Goal

    Select a campaign goal.

    • Reach
    • Incremental Reach
    • CPC
    • CPA
    • VCPM (Viewable CPM)
    • CPCV (Cost per Completed View)
    • ROAS




  7. Click the Create & Link button. Programmatic media buyers or traffickers can add more granular details to the newly created campaign within The Trade Desk.

Link a Cost Line to an Existing Campaign in The Trade Desk

To link a Cost Line to an existing campaign in The Trade Desk, do the following:

  1. Open the OneStrata campaign that contains the desired Cost Line. This Cost Line must have a Supplier entity that is linked to The Trade Desk.

  2. Go to the DSP dashboard for The Trade Desk.

  3. If not logged in already, log in to The Trade Desk.

  4. In the DSP grid, select the Cost Line. Only one Cost Line can be linked at a time.

  5. Click the Upload button to open the Upload widget.

  6. In the Upload widget:
    Field NameAction

    Create Campaign / Existing Campaign

    Select the Existing Campaign option.

    Advertiser

    Search for an advertiser in The Trade Desk by entering at least three letters of the advertiser name.

    Then, select the desired advertiser.

    Campaign

    Search for a campaign in The Trade Desk by entering at least three letters of the campaign name.

    Then, select the desired campaign.

    Read-only

    Date Range

    The value of the Date Range field is automatically populated from the selected campaign and cannot be changed within OneStrata.

    Read-only

    Budget

    The value of the Budget field is automatically populated from the selected campaign and cannot be changed within OneStrata.



  7. Click the Link button.

Unlink a Cost Line from a Campaign in The Trade Desk

See Manage Linked Entities > Unlink a Cost Line.


View the Delivery Metrics of a Linked Campaign in The Trade Desk

See Manage Linked Entities > View the Delivery Metrics of an Entity Linked to a Cost Line.

  • No labels
Provide feedback on this article
You are evaluating Refined.