Use * syntax for faster search
Page History
Section | |||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Overview
Actualization is the process where actual delivery metrics of a campaign are received from a Supplier or a third party and compared to the original schedule. Once these delivery metrics are reviewed by the Agency, the schedule is actualized, and that information is shared with finance for approved amounts to be paid to Suppliers.
Actualization Terms and Concepts
This section contains information about terms and concepts related to actualization in OneStrata.
Types of Actualization
In OneStrata, there are two type of actualization:
- Standard actualization
- Margin actualization
Actualization Type | Description | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| |||||||||||||
Margin actualization
|
|
Media Campaigns > (Specific Campaign) > Actualization Tab UI Reference
The Actualization tab displays information related to actualizing committed Schedule Grid lines.
AnchorActualization-Tab-UI-Elements Actualization-Tab-UI-Elements
Actualization Tab UI Elements
Actualization-Tab-UI-Elements | |
Actualization-Tab-UI-Elements |
The Actualization tab contains the following elements:
Item | Description | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Campaign Header |
| ||||||||
2 | Standard and Margin selection | Click to switch between the Standard Actualization grid and the Margin Actualization grid. | ||||||||
3 | Filters icon
| Click the Filters icon to open the filter pane and filter through the list of all committed schedule lines. | ||||||||
4 | Search bar
| Search for a committed schedule line by Entity (Supplier or Order Partner) or ID. | ||||||||
5 |
| Click the Roll settings to select how any under- or over-delivery balance is carried over to future months:
| ||||||||
6 |
| Click the Apply Source button to override the Schedule grid's Actual Cost for Period, Actual Rate, and Actual Units column values:
| ||||||||
7 | Actualize button | If no Actualization Grid lines are selected, the Actualize button is inactive. If one or more Actualization Grid lines are selected, the Actualize button is active. Click the Actualize button to actualize selected lines. | ||||||||
8 |
| By default, only one billing period (month) is selected and displayed on the Actualization grid.
Click the Billing Period(s) filter to select the Billing Periods that are displayed in the Actualization grid. | ||||||||
9 | Actualization grid | A list of a campaign's committed schedule lines, broken down into selected billing periods and grouped by Order. For more information, see Actualization Grid Reference. |
Anchor | ||||
---|---|---|---|---|
|
The Actualization grid is a list of a campaign's committed Schedule grid lines, broken down into selected billing periods and grouped by order.
There are two Actualization grids, the Standard Actualization grid and the Margin Actualization grid, used for actualizing standard Schedule grid lines and margin Schedule grid lines, respectively.
The following table contains information about the Standard and Margin Actualization grid columns:
Table Filter | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Actualization Triangulation Rules
A set of triangulated values contains three values that are mathematically connected; given any two values, the third value can be calculated from the first two values.
Sets of triangulated values follow this pattern:
- One fixed value
- Two non-fixed values
When one of the non-fixed values is manually changed by the user, the fixed value remains constant, but the other non-fixed value is automatically recalculated.
For example, imagine the following scenario:
- Rate: $1
- Units (fixed): 10
- Cost: $10
If the Rate value is changed to $2, the Units value remains 10 and the Cost value is automatically recalculated to $20. Similarly, if the Cost value is changed to $5, the Units value remains 10 and the Rate value is automatically recalculated to $0.50.
Locked/Unlocked vs. Editable/Read-Only
In OneStrata, triangulated values can be locked or unlocked:
- Locked (fixed): A fixed value that does not change
- Unlocked (non-fixed): A non-fixed value that can be changed, either manually by the user or recalculated by OneStrata
All values, including triangulated and non-triangulated values, can be editable or read-only:
- Editable: A value that can be directly changed by the user
- Read-only: A value that cannot be directly changed by the user
Depending on the triangulation set, the two unlocked (non-fixed) values are either both editable, or one is editable and the other is read-only:
- Both unlocked values are editable: Given a set of triangulated values X, Y, and Z (where Y is fixed), X can be manually changed by the user and Z is recalculated by OneStrata. Or, Z can be manually changed by the user and X is recalculated by OneStrata.
- One unlocked value is editable and one unlocked value is read-only: Given a set of triangulated values X, Y, and Z (where Y is fixed), only X can be manually changed by the user and Z is always recalculated by OneStrata. Z cannot be manually changed by the user.
The interactions between these two dimensions (locked/unlocked and editable/read-only) are summarized in the following table:
Editable (non-italicized text) | Read-only (italicized text) | |
---|---|---|
Locked | N/A | The fixed value in a triangulation set |
Unlocked | A non-fixed value that can be manually changed by the user or recalculated by OneStrata, | A non-fixed value that cannot be manually changed by the user, and can only be recalculated by OneStrata. |
Anchor | ||||
---|---|---|---|---|
|
There is one set of triangulated standard actualization triangulated values:
Column Name | Formula | Lock Rules |
---|---|---|
Actual Cost for Period | Actual Cost for Period = Actual Rate * Actual Units | By default:
Can be locked |
Actual Rate | Actual Rate = Actual Cost for Period / Actual Units | By default:
Can be unlocked |
Actual Units | Actual Units = Actual Cost for Period / Actual Rate | By default:
Can be locked |
AnchorMargin-Actualization-Triangulation-Rules Margin-Actualization-Triangulation-Rules
Margin Actualization Triangulation Rules
Margin-Actualization-Triangulation-Rules | |
Margin-Actualization-Triangulation-Rules |
There are two sets of triangulated margin actualization triangulated values:
- Margin Percentage Triangulation: The relationships between Vendor Net Cost, Margin Percentage, and Client Net Cost
- Margin Rate, Actual Units , and Cost Triangulation: The relationships between Vendor Net Rate, Actual Units, and Vendor Net Cost, and between Client Net Rate, Actual Units, and Client Net Cost
Only one margin actualization triangulation set can be active at a time. By default:
- The Margin Percentage triangulation set is active
- The Margin Rate, Actual Units , and Cost triangulation set is not active
Margin Percentage Triangulation
The Margin Percentage triangulation set is the default set of triangulated values.
Column Name | Description | Lock Rules | Notes |
---|---|---|---|
Vendor Net Cost (VC) | Entered by user or calculated according to this formula: Vendor Net Cost = Client Net Cost - (Margin Percentage * Client Net Cost) | By default:
Can be locked | When the Margin Percentage triangulation set is active:
|
Margin % | Entered by user or calculated according to this formula: Margin Percentage = (Client Net Cost - Vendor Net Cost) / Client Net Cost | By default:
Can be unlocked | |
Client Net Cost (VC) | Entered by user or calculated according to this formula: Client Net Cost = -1 * (Vendor Net Cost / Margin Percentage - 1) | By default:
Can be locked |
Margin
Rate,Actual Units
, and CostTriangulation
By default, the Margin Rate, Actual Units , and Cost triangulation set is not active.
Unlock the Actual Units column to deactivate the Margin Percentage triangulation set and activate the Margin Rate, Actual Units , and Cost triangulation set.
Cost Group | Column Name | Description | Lock Rules | Notes |
---|---|---|---|---|
Vendor | Rate (Vendor Net Rate (VC)) | Read-only value taken from the Schedule grid | Always:
| When the Margin Rate, Actual Units , and Cost triangulation set is active:
|
Actual Units | Entered by user | If the Margin Rate, Actual Units , and Cost triangulation set is active:
| ||
Vendor Net Cost (VC) | Calculated according to this formula: Vendor Net Cost = Vendor Net Rate * Actual Units | If the Margin Rate, Actual Units , and Cost triangulation set is active:
| ||
Client | Client Net Rate (VC) | Read-only value taken from the Schedule grid | Always:
| |
Actual Units | Entered by user | If the Margin Rate, Actual Units , and Cost triangulation set is active:
Can be unlocked | ||
Client Net Cost (VC) | Calculated according to this formula: Client Net Cost = Client Net Rate * Actual Units | If the Margin Rate, Actual Units , and Cost triangulation set is active:
|
...