Use * syntax for faster search

Table of Contents



Overview

OneStrata Cost Lines can be linked to the following external entities:

Oops, it seems that you need to place a table or a macro generating a table within the Table Filter macro.

The table is being loaded. Please wait for a bit ...

OneStrata EntityProvider TypeLinked External EntitySuggested Documentation
Ad PlacementAd Server

OneStrata Ad Placement → CM360 placement

OneStrata Ad Placement → Flashtalking placement

Manage Linked Ad Placements

CampaignAd Server

OneStrata campaign → CM360 campaign

OneStrata campaign → Flashtalking campaign

Manage Linked Campaigns

DSPOneStrata campaign → DV360 campaign
Cost LineDSP

OneStrata Cost Line → Beeswax campaign

OneStrata Cost Line → DV360 insertion order

OneStrata Cost Line → The Trade Desk campaign

Manage Linked Cost Lines

SearchOneStrata Cost Line → Google Ads campaign
SocialOneStrata Cost Line → Meta campaign


Unlink an Entity From a Cost Line

Unlinking an entity from a Cost Line has the following effects:

  • Delivery data for the now-unlinked entity is no longer available in OneStrata.
  • The unlinked entity is not deleted automatically. If the external entity itself should be deleted, this must be done within the external integration provider platform.

To unlink an entity from a Cost Line do the following:

  1. Go to the appropriate external integration dashboard:
    Provider TypeActionStep
    DSP

    Unlink a Beeswax campaign from a Cost Line

    Go to the DSP dashboard for Beeswax.
    Unlink a DV360 campaign from a Cost LineGo to the DSP dashboard for DV360.
    Unlink a campaign in The Trade Desk from a Cost LineGo to the DSP dashboard for The Trade Desk.
    SearchUnlink a Google Ads campaign from a Cost LineGo to the Search dashboard for Google Ads.
    Social

    Unlink a Meta campaign from a Cost Line

    Go to the Social dashboard for Meta.


  2. For the desired entity, select the row action icon (three vertical dots).

  3. Select Unlink. This opens a message asking the user to confirm that the entity should be unlinked.

  4. Confirm that the entity should be unlinked by clicking the Unlink button.

Update an Entity Linked to a Cost Line

For a linked Cost Line and external entity pair, any changes made in OneStrata to the Cost Line are not automatically sent to the linked entity. Instead, these updates must be manually uploaded.

To update an entity linked to a Cost Line, do the following:

  1. Go to the appropriate external integration dashboard:
    Provider TypeActionStep
    DSP

    Update a Beeswax campaign

    Go to the DSP dashboard for Beeswax.
    Update a DV360 insertion orderGo to the DSP dashboard for DV360.
    Update a campaign in The Trade DeskGo to the DSP dashboard for The Trade Desk.
    SearchUpdate a Google Ads campaignGo to the Search dashboard for Google Ads.
    Social

    Update a Meta campaign

    Go to the Social dashboard for Meta.


  2. Review the entity information.

    Mismatching values are highlighted, but depending on whether or not the user is currently logged in to the external integration provider, the highlighted values are different:

    • Logged out: Values that are mismatched between what is currently committed on the Schedule grid and what was last uploaded to the external integration provider are highlighted with a yellow background.

    • Logged in: Values that are mismatched between what is currently committed on the Schedule grid and what is currently in the external integration provider are highlighted with a yellow background.

  3. For the desired entity, select the row action icon (three vertical dots).

  4. Select Update to open the Update widget.

  5. In the Update widget:

    1. In the Update Provider Data section, review the values. The updated values (marked with green) will be sent to the external integration provider and will replace the previously uploaded or current values (marked with red).

    2. Make any other desired changes.

    3. Click the Update button.

View the Details of an Entity Linked to a Cost Line

To view the details of an entity linked to a Cost Line, do the following:

  1. Go to the appropriate external integration dashboard:
    Provider TypeActionStep
    DSP

    View the details of a Beeswax campaign

    Go to the DSP dashboard for Beeswax.
    View the details of a DV360 insertion orderGo to the DSP dashboard for DV360.
    View the details of a campaign in The Trade DeskGo to the DSP dashboard for The Trade Desk.
    SearchView the details of a Google Ads campaignGo to the Search dashboard for Google Ads.
    Social

    View the details of a Meta campaign

    Go to the Social dashboard for Meta.


  2. For the desired entity, select the row action icon (three vertical dots).

  3. Select View to open the View Upload widget.

Depending on the linked entity, different information is displayed in the View Upload widget:



View the Delivery Metrics of an Entity Linked to a Cost Line

If a Cost Line and external entity are linked, the vendor delivery cost and number of delivered units of the linked external entity can be viewed and used for actualization within OneStrata.

To view the delivery metrics of an entity linked to a Cost Line, do the following:

  1. Open the OneStrata campaign that contains the linked entity.

  2. Go to the campaign's Actualization tab.

  3. In the Standard Actualization or Margin Actualization grid, do the following:

    1. Find the Actualization grid line that represents the linked Cost Line, using the (Cost Line) ID or External ID values.

      Delivery data is broken out by billing period month, with each month corresponding to a Billing Period line.

    2. If necessary, scroll horizontally until the Site Cost and Site Unit columns are reached.
      Column NameDescription
      Site CostThe vendor delivery cost of the linked external entity.
      Site UnitThe number of delivered units of the linked external entity.


The Site Cost and Site Unit values can be used for actualization. For more information, see Actualize a Media Cost Line, making sure to select Site as the applied source.

View the Delivery Metrics of Multiple Entities Linked to a Cost Line

When multiple entities are linked to the same Cost Line, the delivery metrics for the linked entities are aggregated at the billing period and Cost Line levels.

Therefore, the process of viewing delivery metrics for multiple entities linked to the same Cost Line is the same as the process of viewing delivery metrics for a single entity linked to a Cost Line.

  • No labels
Provide feedback on this article
You are evaluating Refined.