---
title: "Manage Actualization"
canonical: "https://hub.freewheel.tv/space/OS/115114072/Manage%20Actualization"
format: markdown
---
Overview When schedule lines are committed on the Schedule grid, located on the   Schedule   tab, OneStrata automatically does the following: On the  Schedule  tab: Enables automatic flight period  soft locking On the  Orders  tab: Groups committed lines with the same Order ID into orders on the Orders grid On the  External Integrations  tab: For Placement lines with a Technology Assignment value, creates one or more Ad Placement lines on the Ad Server grid  On the  Actualization  tab: Creates one or more Order, Cost Package, Media Package, Placement, Fee, and Billing Period lines on the Actualization grid The Actualization grid lines can be adjusted as needed, like updated with actual delivery data, and actualized. The validated metrics and amounts are then pushed to the agency's financial system, where client and vendor invoices can be processed. Actualize a Media Cost Line To actualize a media Cost Line ( standard  or  margin ), do the following: General Step Standard Actualization Grid Margin Actualization Grid Open the campaign that contains the Cost Line. N/A N/A Go to the campaign's  Actualization  tab. N/A N/A Go to the appropriate Actualization grid. If the Cost Line is a standard Cost Line, go to the Standard Actualization grid. If the Cost Line is a standard Cost Line, go to the Margin Actualization grid. Review the delivery balance  Roll  setting and make sure that the appropriate option is selected. If desired, change the delivery balance roll option.   N/A N/A Optional: Click the  Billing Period(s)  filter and select the billing period(s) to actualize. By default, only one billing period is displayed: If the campaign is in-flight, the default billing period is the previous month of the campaign. If the campaign has not started yet, the default billing period is the first month of the campaign. If the campaign has already finished, the default billing period is the last month of the campaign. N/A N/A Review the actual values (the values that will be sent to the external financial system). Actual values: Actual Cost for Period Actual Rate Actual Units Actual values: Vendor Net Cost (VC) Margin % Client Net Cost (VC) Actual Units If needed, adjust the actual values.  There are two options: Option 1: Apply an external source Option 2: Manually adjust values Option 1: To apply an external source, do the following: Select the Cost Line or any of the individual billing periods under the Cost Line. Click  Apply Source  and then select the desired source:  Committed ,  Site , or  3rd Party . For information about the effects of applying an external source, see the  Standard Actualization Grid  column in  Effects of Applying an Actual Value Source . Option 2: To manually adjust actual values, do the following: At the Cost Line or billing period level, enter the desired  Actual  Cost for Period ,  Actual Rate , or  Actual Units  value. Depending on which other column is locked, the value of the third column will be automatically recalculated by the system. For more information, see  Apply Standard Actualization Triangulation ,   Option 1: To apply an external source, do the following: Select the Cost Line or any of the individual billing periods under the Cost Line. Click  Apply Source  and then select the desired source:  Committed ,  Site , or  3rd Party . For information about the effects of applying an external source, see the  Margin Actualization Grid  column in  Effects of Applying an Actual Value Source . Option 2: To manually adjust actual values, do one of the following: Update actual vendor cost, client cost, or margin percentage: At the Cost Line or billing period level, enter the desired  Vendor Net Cost (VC) ,  Client Net Cost (VC) , or  Margin %  value. For more information, see  Margin Percentage Triangulation  and  Apply Margin Actualization Triangulation . Update actual units: At the Cost Line or billing period level, unlock the Actual Units column and enter the desired value. For more information, see  Margin Actual Units Triangulation  and  Apply Margin Actualization Triangulation . Click  Actualize . N/A N/A Actualize an Assigned Fee Cost Line OneStrata automatically calculates the cost(s) and units that should be actualized for each billing period of an Assigned fee. These system-calculated values are provided in the Standard Actualization and Margin Actualization grids for easy reference and application. To actualize an Assigned fee (standard or margin) using system-calculated values, do the following: General Step Standard Actualization Grid Margin Actualization Grid Open the campaign that contains the Assigned fee. N/A N/A Go to the campaign's  Actualization  tab. N/A N/A Actualize the media Cost Line that the fee is assigned to, following the instructions in  Actualize a Media Cost Line . N/A N/A Go to the appropriate Actualization grid. If the Assigned fee is a standard fee, go to the Standard Actualization grid. If the Assigned fee is a margin fee, go to the Margin Actualization grid. Review the system-calculated fees for the Assigned fee, which may have changed after the media Cost Line was actualized. This is because the cost and units of an Assigned fee depend on the (actualized) cost and units of the media Cost Line that the fee is assigned to. System-calculated fields: Calculated Fee Cost Fee Calculated Units System-calculated fields: Fee Calculated Vendor Cost Fee Calculated Client Cost Fee Calculated Units Apply the system-calculated values to the actual values (the values that are actualized) by doing the following: Select the Assigned fee. Click the  Apply Source  menu. Select  Media . The following fields are updated: The value of  Actual Cost for Period  is updated with the value of  Calculated Fee Cost . The value of  Actual Units  is updated with the value of  Fee Calculated Units . The following fields are updated: The value of  Vendor Net Cost (VC)  is updated with the value of  Fee Calculated Vendor Cost . The value of  Client Net Cost (VC)  is updated with the value of  Fee Calculated Client Cost . The value of  Actual Units  is updated with the value of  Fee Calculated Units . Optional: Manually adjust the actual values of the Assigned fee. The  Actual Cost for Period ,  Actual Rate , and  Actual Units  columns are linked, and their values are triangulated off each other.  For more information, see   Apply Standard Actualization Triangulation . There are two ways to manually adjust actual values: Update  Vendor Net Cost (VC) ,  Margin % , or  Client Net Cost (VC) :   These three  columns are linked, and their values are triangulated off each other.   For more information, see   Apply Margin Actualization Triangulation  and the  Margin Percentage Triangulation set. Update actual delivered units: Unlock and manually update the  Actual Units  column. For more information, see  Apply Margin Actualization Triangulation  and the  Margin Actual Units Triangulation set. Actualize the Assigned fee by doing the following: Select the Assigned fee. Click  Actualize . N/A N/A