---
title: "Create a Schedule Draft"
canonical: "https://hub.freewheel.tv/space/OS/113737862/Create%20a%20Schedule%20Draft"
format: markdown
---
Before Beginning Here are some things to know before building a schedule: Schedule data and functionality will vary based on agency-specific data and administration settings, OneStrata environment configuration, and user access/permissions. General Tips Add a Media Line to a Schedule Adding one or more media lines to a schedule is the first step of building a schedule. Add a Placement, Media Package, or Cost Package to a Schedule To add a Placement, Media Package, or Cost Package to a schedule, do the following: Open the appropriate media campaign. Navigate to the campaign's   Schedule  tab. In the Schedule Grid, on the  Media  parent row, click the  +  icon. Choose one of the following options: To create a new Placement, select  Placement . To create a new Media Package, select  Media Package . To create a new Cost Package, select  Cost Package . Click the  Save Changes  button. Add A Placement or Media Package to a Cost Package To add a Placement or Media Package to a Cost Package, do the following: Open the appropriate media campaign. Navigate to the campaign's  Schedule  tab. In the Schedule Grid, on the desired Cost Package line, click the  +  icon. Choose one of the following options: To create a new Placement, select  Placement . To create a new Media Package, select  Media Package . Click the  Save Changes  button. Add a Placement to a Media Package To add a Placement to a Media Package, do the following: Open the appropriate media campaign. Navigate to the campaign's  Schedule  tab. In the Schedule Grid, on the desired Media Package line, click the  +  icon. Click the  Save Changes  button. Next Steps Enter details of the newly created media line Optional:  Edit the newly created media line's flight periods Optional: Add another media line to the schedule Optional:  Assign an ad server to a Placement Optional:  Assign a Fee to a Placement Optional: Add a non-media line to the schedule Enter Media Line Details A media line must have all of its required fields filled out,  either by having data manually entered by the user or by inheriting information from a parent row, before it can be committed. However, changes to the Schedule Grid, like creating a new media line or partially filling out media line details, can be saved at any time. The required media line details, or fields, depend on how the Agency has been configured. To fill out a field on the media line, do the following: In the Schedule Grid, on the desired media line, scroll horizontally until the desired field is reached. Double-click the field to enable editing.  Depending on the column type of the field, select or enter the appropriate information. For information on Schedule Grid column types, see  Schedule Grid Reference . Click the  Save Changes  button. Optional: Assign an Ad Server to a Placement OneStrata provides direct integrations with the following ad servers: Campaign Manager 360 Flashtalking An ad server can be assigned to a Placement. When the Placement is committed, OneStrata automatically creates one or more corresponding Ad Placement lines that can then be directly uploaded to the integrated ad server for ad serving or ad tracking. For more information, see  External Integrations . To assign an ad server to a Placement, do the following: In the Schedule Grid, on the desired Placement, double-click the  Technology Assignments  field. In the  Tech Assignments  pane, do the following: For  Assigned , select the desired combination of Provider and Service Type. The  Provider  value is the ad server, and the  Service Type  is the advertising-related service that the ad server provides. Only one Provider per Service Type can be selected. For  Payable Source , select a Provider to use as the payable source in the  External Integrations  tab. Click the  Assign  button. Optional: Assign a Fee to a Placement In OneStrata,  assigned fees  are pre-defined, media-related fees that can be added to Placements in order to track additional costs required to run ad activity, like ad serving and DSP fees. When an assigned fee is added to a Placement, the Schedule Grid automatically creates a non-media Fee line that contains cost information about the fee, if one does not exist already.  If a non-media Fee line for that assigned fee already exists (in other words, the assigned fee has already been added to at least one other Placement), then the fee costs are aggregated into the existing non-media Fee line. Assigned fees can only be added to Placements; if a Media Package or Cost Package contains multiple Placements that should all have the same assigned fee, the assigned fee must be individually added to each Placement. To add an assigned fee to a Placement, do the following: In the Schedule Grid, on the desired Placement, double-click the  Fee Assignments  field. In the  Assigned Fees  pane, do the following: Select the desired assigned fee. Click the  Assign  button. Click the  Save Changes  button. Optional: Add an Non-Media Entered Fee or Central Fee to a Schedule Fees can also be manually added to a schedule, normally as a general service charge. There are two types of non-media fees that can be added to a schedule: Entered fee Central fee Add a Non-Media Entered Fee to a Schedule To add an entered fee to a schedule, do the following: In the Schedule Grid, on the  Non-Media  parent row, click the  +  icon.  Click  Entered Fee . In the newly created non-media Fee line, edit the fields as desired. Click the  Save Changes  button. Add a Non-Media Central Fee to a Schedule To add an entered fee to a schedule, do the following: In the Schedule Grid, on the  Non-Media  parent row, click the  +  icon. Click  Central Fee . In the  Central Fee Records  pane, select the desired central fee. Optional: If the selected central fee is editable within a schedule, edit the fields of the newly created Fee line as desired. Click the  Save Changes  button.