Use * syntax for faster search

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Section
Column
width50%70%
Panel
borderColor#c8c8c8
borderWidth1
borderStylesolid

Table of Contents

Table of Contents
maxLevel2
indent20px
stylenone

Column
width50%30%



Overview

In OneStrataCampaigns, Ad Placements, and Cost Lines can be linked to entities in external integration providers, creating a connection that allows delivery costs and metrics to flow from the provider to OneStrata:

Once an Ad Placement or Cost Line is linked, any changes in OneStrata can be pushed to the external integration provider by updating the linked Ad Placement or Cost Line.

AnchorUpdate-Linked-Ad-PlacementUpdate-Linked-Ad-PlacementUpdate a Linked Ad Placement

To update a linked Ad Placement, do the following:

Go to the Ad Server dashboard. 
On the Ad Server dashboard, review the values of the Ad Placement.
Select the Ad Placement.
Click the Upload button to open the Upload widget.
In the Upload widget:
Review the update the fields as desired. For more information on the fields in the Upload widget, see Upload an Ad Placement as a New Ad Server Placement.
  • Click the Update button.
  • AnchorUpdate-Linked-Cost-LineUpdate-Linked-Cost-LineUpdate a Linked Cost Line

    To update a linked Cost Line, do the following:

    Go to the appropriate dashboard:
    If the Cost Line is linked to a DSP insertion order, go to the DSP dashboard.
    If the Cost Line is linked to a Search campaign, go to the Search dashboard.
    If the Cost Line is linked to a Social campaign, go to the Social dashboard.
    On the DSP, Search, or Social dashboard, review the values of the Cost Line:

    connections that allow information to flow between OneStrata and the provider.

    For more information about each type of linked OneStrata entity, see its corresponding page in the Suggested Documentation column.

    A Shared Block
    shared-block-keyEntity-Linking
    OneStrata EntityProvider TypeLinked External EntitySuggested Documentation
    Ad PlacementAd Server

    OneStrata Ad Placement → CM360 placement

    OneStrata Ad Placement → Flashtalking placement

    Manage Linked Ad Placements

    CampaignAd Server

    OneStrata campaign → CM360 campaign

    OneStrata campaign → Flashtalking campaign

    Manage Linked Campaigns

    DSPOneStrata campaign → DV360 campaign
    Cost LineDSP

    OneStrata Cost Line → Beeswax campaign

    OneStrata Cost Line → DV360 insertion order

    OneStrata Cost Line → The Trade Desk campaign

    Manage Linked Cost Lines

    SearchOneStrata Cost Line → Google Ads campaign
    SocialOneStrata Cost Line → Meta campaign
    Logged out from the external integration provider: Values that are mismatched between what is currently committed on the Schedule grid and what was last uploaded to the external integration provider are highlighted with a yellow background.
    Logged in to the external integration provider: Values that are mismatched between what is currently committed on the Schedule grid and what is in the external integration provider are highlighted with a yellow background.
    Select the Cost Line.
    Click the Update button to open the Update widget.
    In the Update widget:
    In the Update Provider Data section, review the values of the Cost Line. The previously uploaded values (marked with red) will be replaced by the new values (marked with green).
    Click the Update button.
    You are evaluating Refined.