Overview

The tactical details of a campaign—like selecting which placements to buy from which vendors—are defined and managed on the Schedule Grid, located on the Schedule tab.

The Schedule Grid is a spreadsheet-like interface that combines user-entered data with pre-defined reference data records and formulas, making it easy to build out a media buy and quickly calculate costs. When an Agency is ready to move forward, lines on the Schedule Grid can be committed.


Schedule Terms and Concepts

This section contains information about terms and concepts related to schedules in OneStrata.

Types of Schedule Grid Lines

The Schedule grid is a table of media and non-media buys, for a particular schedule option. There are five types of Schedule grid lines:

Media TypeSchedule Grid Line TypeDescription
Media

Anchor
Placement
Placement
Placement


A Shared Block
shared-block-keyPlacement

Represents an ad unit, with one format and one set of flight dates.


Media

Anchor
Media-Package
Media-Package
Media Package


A Shared Block
shared-block-keyMedia-Package

A collection of Placements, grouped by Supplier, with the same rate or cost per unit.


Media

Anchor
Cost-Package
Cost-Package
Cost Package


A Shared Block
shared-block-keyCost-Package

A collection of Placements and Media Packages, grouped by Order Partner, with a fixed total cost. Each Placement or Media Package can have their own set of flight dates.​


Non-MediaEntered Fee

Include A Shared Block
shared-block-keyEntered-Fee
pageAbout Fees and Tech Rates

Non-MediaCentral Fee

Include A Shared Block
shared-block-keyCentral-Fee
pageAbout Fees and Tech Rates

Anchor
About-Committing
About-Committing
About Committing 

In OneStrata, committing a schedule line is the process of indicating that a line on the media schedule is ready to move from a draft state to a "real" state with financial implications. Committing a schedule line makes it available throughout the rest of the OneStrata platform.

Include A Shared Block
shared-block-keyCommit-Effects
pageCommit a Schedule Line

Info

See also:

Anchor
About-Schedule-Options
About-Schedule-Options
About Schedule Options

A campaign can have multiple schedule drafts, in order to map out and consider different budgets and tactics during the planning process. These different options can be shared and reviewed with clients, and iterated on until a specific option is approved.

When one or more lines on a specific option are committed, that schedule option becomes Active and any other schedule options immediately become read-only Archived schedules. Moving forward, any changes to the campaign's media schedule can only be done on the Active schedule option, now just referred to as "the schedule". A campaign that has an active schedule cannot create new schedule draft options.

There are three schedule option types/statuses:

Schedule Option StatusDescription

Anchor
Draft-Schedule-Option
Draft-Schedule-Option
Draft

When a media campaign is first created, the campaign automatically has a single Draft schedule option.

During the initial planning phase, draft schedule options can be freely created, deleted, and renamed within the media campaign. As soon as one or more lines on a specific draft are committed, any other Draft schedule options within the campaign become Archived schedules, and no new Draft schedule options can be created.

Info

See also:


Anchor
Active-Schedule-Option
Active-Schedule-Option
Active

An Active schedule has one or more committed lines, and any number of uncommitted lines.

A media campaign has at most one Active schedule.

Anchor
Archived-Schedule-Option
Archived-Schedule-Option
Archived

During the initial planning phase, a media campaign may have multiple Draft schedule options. When a specific draft is chosen and moved forward, and one or more lines on that draft is committed, any other Draft schedule options become Archived schedules.

Archived schedules are read-only and cannot be edited or deleted.

Anchor
About-Flights
About-Flights
About Flight Periods, Billing Periods, and Unit Calendar

Anchor
Flight-Periods
Flight-Periods
Flight Periods

A Shared Block
shared-block-keyFlight-Period

A media line on the Schedule Grid is divided into one or more flight periods, which defines how many units will be placed during the span of specified start and end dates. By default, flight period dates are bounded by calendar months, but individual flight period start dates and end dates can be changed as desired.

For example, a Placement line that runs from March 15th to May 5th is automatically divided into three flight periods:

  • The first flight period runs from March 15th to March 31st
  • The second flight period runs from April 1st to April 30th
  • The third flight period runs from May 1st to May 22nd

That Placement line's budget is distributed among the flight periods in one of three ways:

  • Pro Rata
    Include A Shared Block Inline
    shared-block-keyCost-Distribution-Pro-Rata
    pageAbout Media Campaigns
  • Even:
    Include A Shared Block Inline
    shared-block-keyCost-Distribution-Even
    pageAbout Media Campaigns
  • Custom: The budget for each flight period is manually entered

The default cost distribution setting is defined at the campaign level. For more information, see Cost Distribution and Change a Campaign's Cost Distribution.

Info

See also:

Anchor
Billing-Periods
Billing-Periods
Billing Periods

A Shared Block
shared-block-keyBilling-Period

Flight Periods are aggregated into monthly billing Periods. Billing periods Billing periods represent the committed financial details of a given month of service for a schedule line, and are used for client/vendor billing and actualization, and each . Each billing period has a corresponding Billing Period line on the Actualization Grid

Although billing periods correspond to calendar months, their exact start or end dates depend on the Flight Period(s) that occur within the billing period. For example, imagine a Placement line that has the following flight periods:

  • Flight period 1: March 15th to March 31st
  • Flight period 2: April 1st to April 30th
  • Flight period 3: May 2nd to May 10th
  • Flight period 4: May 15th to May 20th
  • Flight period 5: May 20th to May 22nd

This Placement line has three billing periods, one for each month:

  • Billing period 1 (March): March 15th to March 31st
  • Billing period 2 (April): April 1st to April 30th
  • Billing period 3 (May): May 2nd to May 22nd

Anchor
Unit-Calendar
Unit-Calendar
Unit Calendar

A Shared Block
shared-block-keyUnit-Calendar

Flight The flight periods and billing periods of a Schedule grid line can be viewed and managed on the Unit Calendar. The Unit Calendar has two parts:

  • The Unit Calendar column on the Schedule Grid: A visual representation of how many units are scheduled to run per flight period, grouped by calendar month.
  • The Unit Calendar editorwidget: Where flight-level adjustments are made, like changing the start or end date of a flight period or adding a new flight period.

Schedule Summary icon

A Shared Block
shared-block-keySchedule-Summary-icon

Image Removed

Click

To open the Unit Calendar editorwidget for a specific Schedule grid line, double click the Unit Calendar column on the Schedule Grid.

Media Campaigns > (Specific Campaign) > Schedule Tab UI Reference

The Schedule tab displays information about a campaign's media and non-media buys.

Image Removed

AnchorSchedule-Tab-UI-ElementsSchedule-Tab-UI-ElementsSchedule Tab UI Elements

The Schedule tab contains the following elements:

Item

Description

1Campaign Header

Include A Shared Block
shared-block-keyCampaign-Header-Reference
pageAbout Media Campaigns

2

Schedule Option List

A list of the campaign's schedule options, if multiple options exist. Also displays the status of the selected schedule option:

  • Draft
  • Active
  • Archived

Click to select which schedule option is displayed in the Schedule Grid.

3

Grouping Options

Click to select how Schedule Grid lines are grouped:

  • No Grouping (Default): Schedule Grid lines are not grouped and are displayed in a flat view
  • Group by Order ID: Schedule Grid lines are grouped by Order ID (the unique, OneStrata identification number of an Order).
4

Filters icon

A Shared Block
shared-block-keyFilters-icon

Image Removed

Click the Filters icon to open the filter pane and filter through the selected schedule option's Schedule grid lines.

5

Columns icon

A Shared Block
shared-block-keyColumns-icon

Image Removed

Click the Columns icon to customize the columns displayed within the Schedule grid.

6

the Schedule

Summary icon to view any required approvals and spend information.
  • Approvals: The status of any required Approvals
  • Budget and Cost: A summary of planned spend and committed spend, in Client Currency:
    • Planned: The sum of all schedule lines with a status of Committed or Draft
    • Committed: The sum of schedule lines with a status of Committed
    • Remaining: The difference between the campaign budget and the Planned or Committed sums
7

Undo / Redo buttons

A Shared Block
shared-block-keyUndo-Redo-buttons

Image Removed

Click to undo or redo any changes to the Schedule grid that have not been saved yet.

8

Search & Scroll bar

Select the name of a column in the Schedule grid, and the Schedule grid will automatically scroll to and highlight the column.

9

Advertiser View button

Click to access the Advertiser View version of the schedule. The Advertiser View page is a read-only, customizable view of the schedule that can be downloaded.

10Import / Export button

Click to import or export the schedule, using the OneStrata Excel template.

Info

This button is only available if the Import/Export Allowed setting has been enabled.

To view this setting, go to:

  • Administration > Application Settings > Media Schedule > (Specific Application Setting record) > Import/Export Allowed
11

Save Changes button

Click the Save Changes button to save any changes made to the Schedule grid.

12

Applied Filters bar

Displays any filters that have been applied to the Schedule grid.

By default, the (Schedule

Grid

Line) Status filter is applied

,

and canceled lines—Schedule Grid lines with the Cancelled status—are filtered out and not included on the Schedule Grid.13 AnchorSchedule-GridSchedule-GridSchedule grid

A list of the selected schedule option's media and non-media buys. By default, Cancelled Schedule Grid lines are filtered out.

For more information, see Schedule Grid Reference.

14

Add Row icon

Image Removed

Image Removed

Click the Add Row icon to add a new Schedule grid line:

If Line Type is Media, click to add a Cost Package, Media Package, Placement, Entered Fee, or Central Fee line.
If Line Type is Cost Package, click to add a Media Package or Placement line to the Cost Package.
If Line Type is Media Package, click to add a Placement line to the Media Package.
  • If Line Type is Non-Media, click to add an Entered Fee or Central Fee line.
  • 15

    Discard Draft button

    Image Removed

    If no Draft - X Schedule grid lines are selected, the Discard Draft button is inactive.

    If one or more Draft - X Schedule grid lines are selected, the Discard Draft button is active.

    Click the Discard Draft button to discard changes to the selected Schedule Grid line(s):

    If Status is Draft - New, click to remove the line from the Schedule Grid.
    If Status is Draft - Revised, click to remove any uncommitted changes from the line.
  • If Status is Draft - Cancelled, click to revert the line's status to Committed and remove its pending cancellation flag.
  • 16

    Cancel button

    Image Removed

    If no Committed Schedule grid lines are selected, the Cancel button is inactive.

    If one or more Committed Schedule grid lines are selected, the Cancel button is active.

    Click the Cancel button to flag the selected line(s)

    for

    cancellation, by changing the line's status from Committed to Draft - Cancelled.17

    Duplicate button

    Image Removed

    Click the Duplicate button to duplicate the selected Schedule grid line(s).

    Duplicated lines are created at the top of the Schedule Grid, and have the status Draft - New.

    18

    Commit button

    Image Removed

    If no Schedule grid lines are selected, the Commit button is inactive.

    If one or more Schedule grid lines are selected, the Commit button is active.

    Click the Commit button to commit the selected Schedule Grid line(s).

    AnchorSchedule-Grid-ReferenceSchedule-Grid-Reference

    Schedule Grid Reference

    A table of the selected schedule option's media and non-media buys. By default, canceled Schedule grid lines are filtered out.

    Info

    Note: Data and functionality available in Schedule will vary based on Agency user access/permissions, Agency Administration settings, and OneStrata environment configuration. 

    List of Schedule Column Types

    Columns in the Schedule Grid are one of the following types:

    Column Type

    Description

    Calculated 

    OneStrata calculates and populates several fields with a variety of formulas and rules to increase efficiency, reduce errors, and handle complex pricing scenarios. These include:

    • Fields based on formulas and rules to determine value such as total costs that include tax and commissions and payable/billable amounts in a different currency.
    Triangulated

    Editable fields with triangulation rules such as rate, unit cost, and cost where changing one value updates the others.

    Concatenated 

    Concatenated fields auto-populate with data from other fields according in the format defined by a formula. Often used to apply naming conventions quickly and easily, these fields auto-populate based on other field values according to a formula. 

    The formula and ability to manually edit or reapply the formula depends on Agency configurations.

    Generated

    Automatically generated by OneStrata.

    Text

    Text fields can be typed in manually with a few variations:

    • No format: Alphanumeric text can be entered manually in no particular format. There may be a character limit.
    • Number fields accept numerical characters 
    • Enter flight dates by typing or double clicking the cell for the calendar widget.
    • Currency type (e.g., USD, EUR, GBP) is enforced in columns with financial data.
    • Percentages in percentage format

    Selected

    Data is entered by selecting from a pre-defined list, typically in a drop-down menu.

    List of Schedule Grid Columns

    A non-exhaustive list of the most common Schedule Grid columns. Depending on how an Agency or Enterprise has been configured, the Schedule Grid may contain additional columns, in a different order.

    Table Filter
    totalrow,,,
    hidelabelsfalse
    ddSeparator/‚
    sparkNameSparkline
    hidePaneFiltration panel
    sparklinefalse
    default,
    isFirstTimeEntertrue
    cell-width250,250
    hideColumnsfalse
    customNoTableMsgfalse
    disabledfalse
    enabledInEditorfalse
    globalFilterfalse
    id1711650940088_2031897808
    order0,1
    hideControlsfalse
    inversefalse,false
    columnColumn Type,Required by OneStrata
    disableSavefalse
    separatorPoint (.)
    labelsColumn Type‚Required by OneStrata
    ddOperatorAND,OR
    datepatterndd M yy
    updateSelectOptionsfalse
    worklog365|5|8|y w d h m|y w d h m
    isORAND
    Required?Column TypeColumn NameDescriptionN/ACheckboxCheckbox

    Click to select one or more Schedule Grid lines.

    N/ASelectedLine Type

    The type of Schedule Grid line:

    • Placement
    • Media Package
    • Cost Package
    • Fee

    N/A

    Generated

    Status (Schedule Grid Line Status)

    The status of the Schedule Grid line:

    Draft - New: The line is not committed.
    Committed: The line is committed.
    Draft - Revised: The line was previously committed, but now has new, uncommitted changes.
    Draft - Cancelled: The line was previously committed and is now pending cancellation. The line will be fully cancelled once it is committed again.
  • Cancelled: The line was previously committed, was flagged for cancellation, and was committed again to complete its cancellation.
  • N/A

    Generated

    ID 

    The unique, OneStrata identification number of the Schedule Grid line.

    Yes

    Selected

    Start Date

    The start date of the Schedule Grid line.

    By default, the Start Date value of a newly created Schedule Grid Line is the start date of the campaign.

    Yes

    Selected

    End Date

    The end date of the Schedule Grid line.

    By default, the End Date value of a newly created Schedule Grid Line is the end date of the campaign.

    YesSelectedSupplier

    The Supplier assigned to the Schedule Grid line.

    Yes

    Selected

    Order Partner

    The Order Partner assigned to the Schedule Grid line.

    Yes

    Selected

    Payee

    The Payee assigned to the Schedule Grid line.

    YesSelectedEstimate ID

    The unique, OneStrata identification number of the Estimate associated with the Schedule Grid line.

    No

    Text,

    Concatenated

    Name

    The user-given name of the Schedule Grid line.

    Yes

    Selected

    Format

    The Format assigned to the Schedule Grid line.

    No

    Selected

    Format Dimension

    The Format Dimensions assigned to the Schedule Grid line. Automatically fills out, based on the Format value, but can be customized.

    Yes

    Selected

    Cost Category

    The Cost Category assigned to the Schedule Grid line.

    No

    Selected

    Cost Method

    The Cost Method assigned to the Schedule Grid line:

    • Standard
    • Margin
    • Allocated
    YesSelectedRate Type

    Pricing model by which the Schedule Grid line is being purchased, such as CPM (Impressions), CPC (Clicks), Fixed, etc.

    The Rate Type value determines the type of Unit represented in the Units value. Rate Type is required before entering rate/units/cost information in a line.

    No

    Triangulated

    Units

    Three fields with number of units, unit cost or rate, and cost are linked by a triangulation rule. When two values are entered, OneStrata automatically calculates the third. 

    The default rules for Units/Rate/Cost are:

    • If Rate is being edited, soft-lock Cost and calculate Units.
    • If Units is being edited, soft-lock Rate and calculate Cost.
    • If Cost is being edited, soft-lock Rate and calculate Units.

    However, the rules and relationships between Units/Rate/Cost may vary depending on Agency or Enterprise settings.

    A Shared Block
    shared-block-keyIn-Vendor-Currency

    Calculated and displayed in Vendor Currency (VC).

    NoTriangulated

    Vendor Net Rate (VC)

    NoTriangulatedVendor Net Cost (VC)

    Yes

    Selected

    Unit Calendar

    A visual representation of how many units are scheduled to run per Flight Period, grouped by calendar month.

    For more information, see About Flight Periods, Billing Periods, and Unit Calendar.

    No

    Selected

    Fee Assignments

    The Fees assigned to the Schedule Grid line.

    For more information, see Assign a Fee to a Placement.

    No

    Selected

    Technology Assignments

    The ad server assigned to the Schedule Grid line.

    For more information, see Assign an Ad Server to a Placement.

    No

    Calculated

    Client Commission Rule

    The default Commission rule is automatically applied. Additional Commission rules may be available, based on the configured Commission records and selections made within the Campaign and Schedule Grid line

    No

    Calculated

    Client Commission Cost (CC)

    Include A Shared Block
    shared-block-keyClient-Commission
    pageCosts and Calculations

    A Shared Block
    shared-block-keyIn-Client-Currency

    Calculated and displayed in Client Currency (CC).

    No

    Calculated

    Client Total Cost (CC)

    Include A Shared Block
    shared-block-keyClient-Total-Cost
    pageCosts and Calculations

    Include A Shared Block
    shared-block-keyIn-Client-Currency
    pageAbout Schedules

    No

    Calculated

    Client Net Cost (CC)

    Include A Shared Block
    shared-block-keyClient-Net-Cost
    pageCosts and Calculations

    Include A Shared Block
    shared-block-keyIn-Client-Currency
    pageAbout Schedules

    No

    Calculated

    Margin Percentage

    Include A Shared Block
    shared-block-keyMargin-Percentage
    pageCosts and Calculations

    No

    Calculated

    Other Income Cost (VC)

    The difference between Vendor Net Cost (VC) and Client Net Cost (VC) for margin lines.

    Include A Shared Block
    shared-block-keyIn-Vendor-Currency
    pageAbout Schedules

    No

    Calculated

    Allocated Amount (CC)

    Client budget allocated to a cost line in the schedule which includes both the media cost and the fee costs.

    Include A Shared Block
    shared-block-keyIn-Client-Currency
    pageAbout Schedules

    No

    Calculated

    Allocated Fee Cost (CC)

    Client net cost of any fees applied to the media line which are based on the Allocated amount. If the fee is applied to more than one line, this is the portion of the fee in relation to this media line.

    Include A Shared Blockshared-block-keyIn-Client-CurrencypageAbout Schedules

    the desired line. For more information, see Unit Calendar Widget Reference.